All posts by CSE_Department

NOTICE: B.Tech. CSE VII Semester – Major Project Progress Report 1 Presentation

The Progress Report 1 presentations for the B.Tech CSE VII Semester Major Project will be held from 08 October 2026 to 14 October 2026. The group-wise evaluator, date, time, and venue are given in the attached schedule Click here to download. All students must check the entry for their group number.

Please note the following:

1) Your group will be evaluated by the faculty evaluator named in the schedule.

2) Prepare your report and presentation according to the Progress Report 1 guidelines already shared with you. These cover the Introduction, the Literature Survey with comparative table (25–30 papers), the Research Gap and the References.
Marks are awarded to each student individually.

3) Every team member must be present, be able to explain the work, and answer questions on the problem, the papers surveyed and the research gap.

4) The report must be in your own words. Copied content will be penalised.

5) Report to the venue at the date and time shown for your group.

NOTICE: Major Project Synopsis Presentation – B.Tech CSE VII Semester

All B.Tech CSE VII Semester students are hereby informed that the Major Project Synopsis Presentations will be conducted from 08 September to 11 September 2026.

Students are required to:

  • Check the presentation schedule for their Project Team ID, mentor, date, time, and venue.
  • Attend the presentation with all group members and report 10 minutes before the scheduled time.
  • Prepare the synopsis presentation as per the prescribed Synopsis Format and Guidelines.
  • Prepare the synopsis report in consultation with their assigned Project Mentor.

The following Documents are Attached below as a Link:
1) Major Project Synopsis Presentation Schedule
2) Major Project Synopsis Format 2026–27
3) Guidelines for the Preparation of Major Project Synopsis Report

Click the following links to download the Documents:

Major Project Synopsis Presentation Schedule

Major Project Synopsis Format 2026–27

Guidelines for the Preparation of Major Project Synopsis Report

All students are advised to carefully follow the schedule and prescribed guidelines.

Department of Computer Science & Engineering
Graphic Era Hill University, Dehradun

Notice: Final Year Major Project Groups and Mentors

Dear Students,

This is to inform you that the final project groups and mentor allocation have been completed. The attached list contains the finalized groups along with the assigned mentors.

Please note that no further changes will be entertained in the groups or mentor allocation. All students are advised to proceed with their respective teams and start working on their project planning and discussions with the assigned mentors.

You are required to be prepared with the initial project details, including:

Project Title – A clear and relevant title representing your project idea.
Abstract – A brief summary explaining the project concept, objectives, and expected outcomes.
Brief Introduction – Background of the problem, importance of the project, and motivation behind selecting the topic.
Methodology – The approach, techniques, technologies, tools, and steps you are planning to follow for completing the project.
Project Flow Chart – A proper flow diagram representing the complete workflow of your project, including major phases from problem identification to final implementation and evaluation.

Since this is a one-year major project, you are expected to clearly understand the project scope, objectives, implementation plan, and expected outcomes before proceeding further.

Further guidelines regarding project documentation, review schedules, evaluation criteria, synopsis submission, and other important details will be shared soon.

Students are requested to coordinate with their respective mentors and start preparing the initial project proposal.

The list containing the finalized groups along with the assigned mentors is attached here: Click here to download

Notice: Industrial Interaction (Internship) Certificate and Report Submission (2026–2027) for 7th Semester Students

Dear Students, please find the details regarding Industrial Interaction (Internship) Certificate and Report Submission (2026–2027) for 7th Semester Students at the following link: Click here to download

The guidelines for the preparation of Industrial Interaction report are available at the following link: Click here to download

The format of front pages of Industrial Interaction Report are available at the following link: Click here to download